Voyager DP-263-S Betriebsanweisung Seite 124

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 612
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 123
Chapter 2 Installing the Voyager™ Biospectrometry™ Workstations
2-46 PerSeptive Biosystems
2
2.8 Startup and Shutdown
In this section
This section describes:
Powering up
•Initializing
Reinitializing
Powering down system components
Powering down the mass spectrometer
Powering up
To power up the Voyager Workstation:
1. Turn on the main power switch. The power switch is
located:
On the right side panel of the mass spectrometer
cabinet on Voyager-DE and Voyager-DE PRO
systems.
On the back panel of the mass spectrometer
cabinet on the Voyager-DE STR system.
The vacuum pumping system begins running.
After two minutes, the turbo pump starts. You will hear a
whine as the vacuum system spins up to speed.
2. Turn on remaining system devices in this order:
Video monitor
External digitizer, if your system includes one
Oscilloscope, if your system includes one
Computer
Printer
3. If your system includes an oscilloscope, observe the
oscilloscope and wait approximately one minute until it
completes its initialization cycle. When the cycle is
complete, a message stating that the power on self check
passed is displayed, then the oscilloscope screen is
displayed. See Appendix I, Using the Oscilloscope and
Control Stick, for more information.
Seitenansicht 123
1 2 ... 119 120 121 122 123 124 125 126 127 128 129 ... 611 612

Kommentare zu diesen Handbüchern

Keine Kommentare